01
Review design inputs
Confirm feedstock tests, supply, outputs, hours, site and local responsibilities.
Turn feedstock, objectives, site, utilities and local requirements into process flow, equipment, layout, interfaces and acceptance boundaries.
The preliminary route supports early discussion. Final configuration follows detailed design, local review and approved project documents.
Process and engineering outputs
Engineering starts with feedstock, output objectives, operating organization, site, utilities and local requirements. A concept compares routes; procurement and fabrication require approved flows, equipment lists, interfaces and acceptance documents.
01
Confirm feedstock tests, supply, outputs, hours, site and local responsibilities.
02
Compare pretreatment, operating mode, condensation, gas, environmental and downstream modules.
03
Use stated assumptions to review feed, streams, utilities and major equipment loads.
04
Set core equipment, supporting modules, mechanical, electrical, controls and civil interfaces.
05
Check logistics, operation, lifting, fire access, cleaning and maintenance space.
06
Carry approved revisions, open items and changes into fabrication and acceptance.