Turkmenistan waste-oil distillation factory inspection

The customer reviewed equipment manufacturing status and discussed project scope and dispatch readiness in the factory.

This page records the factory-inspection stage. Installation, commissioning and operating status require separate project records.

Factory visit and technical discussion

Turkmenistan customer factory inspection for waste-oil distillation equipment

Customer representatives reviewed equipment status and discussed feedstock, process, scope, manufacturing progress and dispatch preparation at RUNDA's factory.

A factory inspection is one procurement milestone. The record should state whether it was a formal FAT, which documents were signed and which items remained open.

The visit does not by itself prove contract status, final configuration, shipment, installation or product quality. Later milestones require their own approved records.

  • Waste-oil distillation and upgrading plant

  • Waste-oil regeneration solution

  • Quality and factory acceptance